Terminal II Cairo international airport

Project name    TERMINAL II CAIRO  INTERNATIONAL AIRPORT
Customer  LIMAK
End User  CAC
Segment PMCS
Country  EGYPT
Duration 2014 - 2016

Scope :

Design,Supply,Engineering, configuration,programming and commissioning of SCADA & power Managmement System (PME) for Medium Voltage (MV) SWGR & Low Voltage (LV) SWGR inside the Airport.

Solution Description :

Two Control rooms each one have redundant servers & Two Workstations to Monitor & Control the following :

  • Qty (2) LV SWGR Panel and Qty (3) MV SWGR Panel through QTy (1) DCONC Control panel in power plant building.
  • Qty (13) LV SWGR Panel and Qty (1) MV SWGR Panel through QTy (1) DCONC Control panel in building C.
  • Qty (26) LV SWGR Panel and Qty (2) MV SWGR Panel through QTy (2) DCONC Control panel in building B.
  • Qty (10) LV SWGR Panel and Qty (1) MV SWGR Panel through QTy (1) DCONC Control panel in building A.
  • Qty (600 ) Power Meter & protection relays Installed inside LV & MV Panels
  • Integration with Generators, Transformers& UPSs exist in the System