Project name |
New Hamad international Airport |
Customer |
Anel |
End User |
NDIA |
Segment |
PMCS |
Country |
QATAR |
Duration |
2013 - 2018 |
Scope :
Design,Supply,Engineering, configuration,programming and commissioning of SCADA & power Managmement System (PME) for Medium Voltage (MV) SWGR & Low Voltage (LV) SWGR inside the Airport.
Solution Description :
Two Control rooms each one have redundant servers & Two Workstations to Monitor & Control the following :
- Qty (12) LV SWGR Panel Through QTy (6) DCONC Control panel in terminal Building A & B
- Qty (12) LV SWGR Panel Through QTy (6) DCONC Control panel in terminal Building C
- Qty (12) LV SWGR Panel Through QTy (6) DCONC Control panel in Emiri terminal
- Qty (4) LV SWGR Panel Through QTy (2) DCONC Control panel in car park & mosque
- Qty (4) LV SWGR Panel Through QTy (1) DCONC Control panel in CP50
- Qty (4) LV SWGR Panel Through QTy (1) DCONC Control panel in CP51
- Qty (1100 ) Power Meter Installed inside LV & sub LV Panels
- Integration with exist Siemens SCADA & BMS System